MOSAIC
The MOSAIC preset project has these requirements.
Data entry requirements
| Field | Required? | Note |
|---|---|---|
| ID1 (PTID) | Required | -- |
| ID2 (Study) | Required | -- |
| ID3 | Optional | -- |
| Collection Time | Required | -- |
The MOSAIC preset project has these requirements.
| Field | Required? | Note |
|---|---|---|
| ID1 (PTID) | Required | -- |
| ID2 (Study) | Required | -- |
| ID3 | Optional | -- |
| Collection Time | Required | -- |