CEMALB

The CEMALB preset project must meet these requirements.

Data entry requirements

Field Required? Note
ID1 (PID) Required Must be 5 characters
ID2 (Protocol) Required --
ID3 (Visit) Optional --
Visit Optional --
OPID Optional --
Clinic Optional --
Draw Time Optional --
Received Time Optional --